December 13 5:00 AM
Routes 4 and 5 are detouring on 13th to Shoreline and back to Americana. The Inbound stop at River and 15th is closed. No temporary stop placed.
Routes 4 and 5 are detouring on 13th to Shoreline and back to Americana. The Inbound stop at River and 15th is closed. No temporary stop placed.
The River Street off ramp will be closed to 14th street from 12/9/24 to 12/20/24. The detour will be as follows: Outbound buses will continue on the connector to 13th Street. Turn right onto 13th Street and go to River Street. Turn left onto River Street to get back on route. No stops will be missed.
For the outbound routes 2, 16 and 17 stop on Main and 3rd is closed for long term, please use stop on Main and 1st. Thank you.
Due to road construction, route 16 is on detour. Stops on 1st/Idaho and 1st/Bannock will be closed, use stop on Main and 1st.
Change Day is upon us! Learn about the new system, grab some VRT merch, and get help planning your trip.